The Order of Your Remodel Will Determine The Outcome

18 May 2021
Blog

The Order of Your Remodel Will Determine the Outcome

Are you considering or have you already decided to take the plunge to remodel your home? Before you go trotting down to your favorite design studio, be sure you understand what is involved in a remodel.

Get Everyone's Buy-In 

A remodel can be likened to steering a two-person kayak. Both people in the kayak must row in the same direction at the same time, otherwise they will be going in circles, or moving along very slowly while the one rowing gets exhausted and angry. The whole ordeal will be a disaster.

During a remodel, all the people in the household (or at least those holding the purse strings) need to agree with the process, design, and budget.

Rosie on the House Getting To Know Your Contractor

So, let’s go step by step through the process of a remodel.

Agree On Remodeling

This may be a no-brainer, but again, see above. You'll want everybody on the same page.

Make A Plan

Decide on the part(s) of the home that is going to be remodeled. If remodeling multiple rooms, prioritize where you want to start.

“A lot of people don’t think enough about the planning phase before they take a hammer to anything,” says Bruce Stumbo, Project Manager & Sales Consultant, Rosie Right | Design. Build. Remodel.. “Planning is very important when remodeling. Getting all the plans, permits and finalizing the design, are all a part of that. The more time that is spent in the design process making good decisions, the less headaches later. “

Build A Budget

Remodeling is not an inexpensive project, regardless of whether you are doing the work yourself or hiring a professional contractor (which we will discuss later.) “Another challenge right now is that material costs are increasing weekly,” says Stumbo, “For example, our electrician is now having to purchase wire at an increase of more than 100 percent of what it was a year ago.”

Rosie on the House Kitchen Remodel

CNBC reported on April 21, 2021, “Lumber prices seem to set a new record almost daily, now up 67 percent this year and up 340 percent from a year ago, according to Random Lengths, a wood products industry tracking firm. And lumber doesn’t just go into framing a house. Those added costs hit cabinets, doors, windows and flooring.”

So, what happens to your estimate if, by the time the project is done, the costs have risen? Will those costs be passed on to you? That is going to depend on a number of factors. If you’ve just received a rough budget estimate from a contractor and are not in a construction agreement with them, then yes, your costs are going to go up. If you’re in a contract, then the answer is maybe. A standard construction agreement is going to include wording that addresses the ability of the contractor to pass along material cost increases to the customer. Some contractors will absorb minor material cost increases without passing the cost along to the customer. However large increases cannot typically be absorbed in the budget and the contractor may ask their client to cover the increased material costs.

Don’t know how to budget for a remodeling project? Remodeling Magazine's annual Cost vs. Value Report projects average job costs. Pad that budget with an extra 10 to 20 percent for unexpected costs.

Hire A Contractor

We are not talking about a weekend warrior project here. Use a contractor who is licensed by the Arizona Registrar of Contractors. Rosie’s How To Hire A Contractor Consumer Guide and this recent Rosie article will guide you along. Also, check the Rosie on the House Certified Partner Referral Network

Loop In Your Insurance Company

Contact your insurance agent before and after your project to make sure you have the proper amount of coverage. Because the renovation could raise your home's value, you may need to increase your coverage limits. It is also critical that your contractor has proper insurance before you sign the contract and start the project.

Secure Permits and Order Materials 

Rosie on the House Work Permit

Permits are required in most jurisdictions. They are critical to issues that could affect your project. Make sure your contractor checks the building departments latest regulations in your area. Once the permits are secured the materials such as lumber, drywall, new windows and doors, and appliances can be ordered.

Important note: It is not only the materials and appliances that cost more, they are taking longer to be delivered as well. Be sure to account for delivery times in the planning step.

“Making sure the materials will show up on time is important,” says Stumbo. “Their delay can alter the project’s schedule. A good contractor will be able to manage that with minimum impact to the project schedule.”

Demolition 

Demolition can start once all of the materials arrive on site and have been inspected. You don’t want to be left with exposed areas because a wall was removed before the new framing and drywall arrived.

If These Walls Could Talk

Rosie on the House Temporary WallsThe work behind walls, below floors, and above ceilings including rough electrical, plumbing, gas piping, heating and air conditioning, subfloors and insulation take place in this stage.

Inspections

“Inspections happen throughout the process, depending on the scope of the project,” says Stumbo. “Many homeowners just assume that they are being done, but a good contractor will tell the client when the inspections are scheduled and when they have passed.”

Paint and Install Flooring

“We prefer to prime and paint before working on the floor,” says Stumbo. “But sometimes we have to install the flooring first depending on materials and contractor schedules.”

Install Cabinetry  

Time for the cabinets. The upper cabinets are installed before the lower ones. Once the cabinets have been installed the countertops can be templated, manufactured, and then installed. The countertop process typically takes around 10 working days.

The Finishing Touches

Final painting, touch-ups, backsplashes, floor sealing, light fixtures, and hardware all happen here; followed by the fun part – décor!

For every one day spent in the proper planning of your remodel project, you could be saving weeks of construction time. Knowing what you want the outcome to be helps with planning each step along the way. Making design and product selections during the course of construction, in our experience, will greatly increase the anxiety level for all involved. Plan ahead and pick your team carefully!

Podcast

Broadcasting Live From Sanderson Ford's Sale 66 Celebration! Including special guests Phoenix Suns Play By Play Legend Al McCoy, KTAR's Mike Broomhead and KNIX's Tim Hattrick with their favorite stories about Route 66. Plus, our topic of the week: Are you considering or have you already decided to take the plunge to remodel your home? Before you go trotting down to your favorite design studio, be sure you understand what is involved in a remodel. We also cover our Weekly To Do on #CeilingFans.

###

 